How to Get Map Approval in YEIDA Authority — A Complete Step-by-Step Guide (Architect in YEIDA Authority Map Approval)
- Shahwalia Architect
- Nov 10
- 6 min read
The Yamuna Expressway Industrial Development Authority (YEIDA) is transforming the real estate landscape of Delhi NCR. From residential townships to industrial and commercial developments, the Yamuna Expressway region has become one of the most promising investment destinations in India — especially with the upcoming Noida International Airport (Jewar Airport).
If you own a residential or industrial plot in any of YEIDA’s sectors (like 18, 20, 22D, or 25), the first and most important step before starting construction is obtaining map approval from YEIDA Authority. This ensures that your building plans comply with the official building bylaws and development regulations.
In this comprehensive guide, we’ll explain how to get map approval in YEIDA Authority, what documents you need, the process timeline, costs involved, and how an architect in YEIDA authority map approval can make your journey smooth and hassle-free.

1. Understanding What Map Approval Means
Before you start constructing any residential, commercial, or industrial building on your plot, you must get official permission from YEIDA to proceed with your building plan. This permission is known as “Building Plan Approval” or “Map Approval.”
In simple terms, map approval is YEIDA’s way of ensuring:
Your construction follows the approved Floor Area Ratio (FAR) and setback norms.
The building design meets safety and planning standards.
The layout and structure comply with zoning laws for your specific sector and plot type.
Without this approval, any construction is considered unauthorized, and you may face penalties or even demolition notices.
2. Importance of Hiring an Architect in YEIDA Authority Map Approval
Getting map approval from YEIDA is not something you can do entirely on your own — it requires a registered architect who is authorized by YEIDA. These architects are trained and licensed to design plans according to the Authority’s specific guidelines and submit them for approval.
Why You Need a YEIDA-Registered Architect:
They are familiar with YEIDA’s online map submission system.
They understand plot size-based building bylaws (like 120 sqm, 300 sqm, 500 sqm, etc.).
They ensure technical compliance — setback, FAR, parking, and structure safety norms.
They represent your case before YEIDA if any corrections or clarifications are required.
👉 Pro Tip: Always verify your architect’s YEIDA registration number before proceeding.
Why Shahwalia Architect Is the Right Choice
At Shahwalia Architect, we are one of the oldest and most trusted architecture and construction firms serving Delhi NCR since 1986.Our team is fully registered with YEIDA for architectural map approval, providing end-to-end support — from plan design to final approval and construction supervision.
We specialize in YEIDA-approved maps for:
Residential plots — 120 sqm, 300 sqm, 500 sqm, and above.
Industrial and commercial plots.
Farmhouses and mixed-use developments.
3. Types of Map Approvals in YEIDA
YEIDA offers different types of map approvals based on the nature of your property and its stage of construction:
Type of Approval | Description |
New Construction Map Approval | For fresh construction on allotted or purchased plots. |
Revised Map Approval | When you modify an existing approved design (e.g., adding floors). |
Regularization Map Approval | For existing structures built without prior approval, to make them legal. |
Completion Certificate (CC) | After construction, you need this approval to prove your building follows the sanctioned plan. |
Each of these processes must be initiated through a registered architect in YEIDA authority map approval who will guide you through the required documentation and submission.
4. YEIDA Map Approval Process — Step by Step
Here’s the complete process to obtain map approval in YEIDA Authority for residential or commercial plots:
Step 1: Appointment of a Registered Architect
Hire an authorized YEIDA architect (like Shahwalia Architect). Your architect will verify your plot details, lease deed, and sector zoning to ensure compliance before preparing the plan.
Step 2: Site Visit and Measurement
The architect conducts a site survey to confirm:
Actual plot dimensions.
Location of approach road and drainage.
Neighboring plots and utility access.
This step ensures that your design matches the actual plot boundaries.
Step 3: Preparing the Building Plan
Your architect designs a building layout as per YEIDA’s building bylaws, including:
Ground coverage and FAR calculations.
Setback on all four sides.
Building height and number of floors.
Parking area and service zones.
Utility plans (water, electricity, drainage).
The plan typically includes:
Site Plan
Floor Plans (All Levels)
Elevations and Sections
Structural Details
Area Statement
Step 4: Online Submission on YEIDA Portal
YEIDA has an online building plan approval system where architects can upload digital drawings and required documents.
Your architect logs into the YEIDA online portal, fills in your plot details, uploads the AutoCAD files, and submits the plan for approval.
Step 5: Document Verification by YEIDA
YEIDA officials review the uploaded plan and attached documents. If discrepancies or missing details are found, they request corrections. Your architect then makes necessary revisions and resubmits.
Step 6: Fee Payment
The approval process includes certain scrutiny fees and development charges based on the plot area and type (residential, commercial, industrial).These fees are calculated online and can be paid via net banking or challan.
Step 7: Approval Issuance
Once all documents and drawings meet the requirements, YEIDA issues an Approved Building Plan digitally signed by the authority.This document allows you to start your construction legally.
Typical approval time: 15–30 working days, depending on submission completeness.
5. Documents Required for Map Approval
Here’s a list of documents you’ll need to prepare before submission:
For Individual Plot Owners:
Copy of Allotment Letter and Possession Certificate.
Copy of Lease Deed or Registered Sale Deed.
Owner’s ID Proof (Aadhaar, PAN).
Architect’s License Copy (YEIDA Registered).
Building Plan Drawings (in AutoCAD + PDF format).
Latest Property Tax Receipt (if applicable).
NOC from Co-owner (if jointly owned).
For Industrial or Commercial Plots:
Company registration certificate.
Authorized signatory ID.
Plot layout and activity plan.
Fire safety and pollution control NOCs (if applicable).
💡 Ensure all documents are legible, up-to-date, and properly signed to avoid delays.
6. Common Reasons for Map Approval Rejection
Even minor errors can delay your map approval process. Here are the most common mistakes to avoid:
Incorrect setback measurements or FAR calculation.
Submitting incomplete or outdated documents.
Not using a YEIDA-registered architect.
Discrepancies between site dimensions and layout plan.
Violating height restrictions or encroaching on open spaces.
Having an experienced architect in YEIDA authority map approval eliminates most of these issues and ensures faster approvals.
7. Timeline and Cost Estimate for Map Approval
Stage | Average Time | Estimated Cost Range |
Drafting & Document Collection | 3–5 Days | ₹5,000 – ₹10,000 |
Online Submission & Corrections | 5–10 Days | ₹10,000 – ₹20,000 |
Authority Scrutiny & Approval | 15–30 Days | ₹5,000 – ₹15,000 |
Total Estimated Time & Cost | 25–45 Days | ₹20,000 – ₹45,000 (varies by plot size) |
Note: These costs are indicative and may vary depending on YEIDA’s latest fee structure and plot category.
8. Post-Approval Steps
After obtaining your approved building plan, you can start construction legally. However, keep these points in mind:
Always build strictly according to the approved plan.
Any deviation or extension later requires revised map approval.
After construction, apply for the Completion Certificate (CC).
Only after CC can you apply for permanent water, electricity, and registry.
Your architect can guide you through these steps as well.
9. Why Choose Shahwalia Architect for YEIDA Map Approvals
Shahwalia Architect is among the few firms in Delhi-NCR with over 35 years of architectural and construction expertise and YEIDA registration authorization.
Our YEIDA Services Include:
Map drawing and design as per YEIDA bylaws.
Online submission and follow-up with YEIDA officials.
Structural, plumbing, and electrical drawings.
Site supervision during and after approval.
Assistance in obtaining Completion Certificate (CC).
With a proven track record of handling hundreds of map approvals for residential, industrial, and commercial projects, we ensure a smooth, compliant, and time-efficient process.
10. Final Thoughts
Getting map approval in YEIDA Authority might seem complex, but with the right guidance, it can be a straightforward process.From designing your layout to obtaining official permission, every step requires technical accuracy and compliance — something that only a qualified architect in YEIDA authority map approval can ensure.
If you’re planning to construct on your plot in Yamuna Expressway or any YEIDA sector, partner with Shahwalia Architect — your trusted architecture and construction experts since 1986.
We make sure your dream project begins the right way — legally approved, beautifully designed, and perfectly executed.
✅ Tags:
architect in YEIDA authority map approval
YEIDA map approval process
building plan approval YEIDA
map approval in Yamuna Expressway
Shahwalia Architect YEIDA map
YEIDA construction rules
YEIDA building plan architect





Comments